SourcingAI

Automatic cooling system factory

I have found results from200000+products and100000+suppliers aboutAutomatic cooling system factory

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Automatic Hatching Machine
Type: Flotation Machine
Type: Breeding
Type: Cleaning
Type: Feeding
Type: Ionizer
High Pressure Micro Fog
High Voltage Electric Field Sterilization Equipment
Usage: Incubation Equipment
Application: Chicken
Power Source: Electric
Blade Type: Straight Teeth
Computerized: Computerized
Certification: QS
Condition: New
Method: Combined Treatment
Motive Force: Pressure
Style: Vertical
Performance: Efficient Filtration
Aromatherapy: No
Humidity Control: Automatic
Humidification Method: Mist Discharge
With Timing Function
With Water Shortage Power-off Protection
Hot Blast Stove
Aerosol Immune Machine
Automatic Grade: Full-Automatic
Structure: Vertical
Control Type: Built-in Control
Function: Heating
Heat Settings: High
Material: Polyester
Safety Features: Auto Shut-off
Size: Double
Suitable for: Poultry
Installation: Ground Installation
Voltage: 380V
Salt Rejection Rate: 99.0%
Capacity: 400 Gallon
Engineers Available to Service Machinery Overseas
Application Area: Chemical
Cooling Method: Water Cooling
Main Material: Aluminum
Mixing Capacity: 500-999L
Mixing Drum Shape: Drum
Speed Control: Variable Speed
60 R/min & Above
Stirring Type: Gravity
Warranty: 1 year
High Speed Mixer
Air Tube Material: Plastics
Corrosion Durability: Higher
Noise Level: Low
Mounting: Floor Standing
Lifetime: 10~15 years
Condensation Forms: Water-Cooled
Structural Form: Horizontal
Heat Transfer Mode: Regenerative
Form: Fixed Tube-Sheet
Control: Automatic
Water: Demineralized Water
90-150 Square Meter
Water Tank Capacity: >10L
Customized: Customized
Scale: Large
Automation: Automatic
Operation: Intermittent
Property: Physical Sterilization
Processing Material: Natural Ingredients
Usage: Industrial
Usage: Agriculture
Usage: Environmental Protection
Usage: Home
Usage: Industry
Usage: Car
Usage: Reproduction Apparatus
Usage: Chemical Industry
Application: Horse
Application: Industry
Application: Granules
Application: Powder
Application: Fruit
Power Source: Gasoline
Power Source: Plug-in
Blade Type: Curved Teeth
Computerized: Non-Computerized
Certification: GMP
Certification: ISO9001:2008
Certification: CE
Certification: ISO
Certification: GS
Certification: RoHS
Certification: CB
Certification: LFGB
Certification: UR
Certification: EMF
Certification: EMC
Certification: SASO
Certification: ISO9001
Condition: Used
Motive Force: Electric power
Style: Floor Standing
Performance: Sophisticated Filters
Automatic Grade: Automatic
Structure: Pressure
Structure: Plate
Function: Temperature Adjustment
Function: Timer
Function: Usability
Function: Comfortability
Heat Settings: Low
Heat Settings: Medium
Material: Plastic
Safety Features: Overheat Protection
Safety Features: Waterproof
Installation: Wall Mounted
Salt Rejection Rate: 98.0%
Capacity: 200 Gallon
Free Spare Parts
Online Support, video Technical Support
Application Area: Daily Chemical
Main Material: Stainless Steel
Water: Pure Water
Water: Tap Water

Sourcing guidance for Automatic Cooling System Factory

What are the key technical specifications to evaluate when sourcing an automatic cooling system?

When procuring industrial cooling systems, you must prioritize Cooling Capacity (measured in kW or Tons) to ensure it meets your heat load requirements. Key components should include high-efficiency compressors (e.g., Bitzer or Copeland), PLC control systems (such as Siemens or Schneider) for automation, and stainless steel heat exchangers to prevent corrosion. Ensure the system supports Variable Frequency Drive (VFD) technology to optimize energy consumption during partial load operations.

Which international compliance standards are mandatory for cooling system factories?

Suppliers must adhere to CE marking for the European market or UL/CSA certification for North America. Since these systems involve pressure vessels, look for ASME (American Society of Mechanical Engineers) or PED (Pressure Equipment Directive) compliance. Additionally, verify that the refrigerants used comply with the Montreal Protocol and F-Gas regulations, prioritizing eco-friendly options like R32, R410A, or R134a.

How can I verify the automation and integration capabilities of the factory's system?

A modern automatic cooling system should offer BMS (Building Management System) integration via protocols like Modbus, BACnet, or LonWorks. Ask the supplier if they provide remote monitoring dashboards and automated fault diagnostic alerts. For factory-level automation, the system should allow for seamless API connectivity with existing production line controllers to synchronize cooling cycles with machine operation.

What maintenance and durability benchmarks should be expected?

Top-tier factories provide systems with a service life of 15-20 years. Look for IP55 or higher rated electrical cabinets for protection against dust and moisture. The supplier should offer a comprehensive maintenance schedule, including easy access to washable air filters and condenser coils. Ensure the frame is treated with anti-corrosion coatings, especially if the factory is located in a coastal or high-humidity environment.

Cross-Border Procurement & Risk Management for Industrial Cooling Systems

What are the primary risks when importing large-scale cooling machinery?

The biggest risks include damage during maritime transit and technical incompatibility with local voltage/frequency (e.g., 50Hz vs 60Hz). To mitigate this, insist on seaworthy vacuum packaging and reinforced wooden crates. Always confirm the electrical phase and voltage requirements in writing before production begins to avoid costly on-site modifications.

How should I negotiate with Chinese cooling system manufacturers for the best value?

Focus on the Total Cost of Ownership (TCO) rather than just the initial purchase price. Negotiate for extended warranties (24-36 months) and the inclusion of a 'wear-and-tear' spare parts kit (valves, sensors, gaskets) at no extra cost. For large projects, suggest a staged payment plan linked to production milestones: 30% deposit, 40% after successful factory testing (FAT), and 30% after delivery and inspection.

What is the most secure way to handle transactions and quality control?

Utilize Trade Assurance services provided by reputable platforms like Made-in-China.com to protect your payment. Never skip a Pre-Shipment Inspection (PSI); hire a third-party agency (like SGS or Intertek) to conduct a Full Load Performance Test at the factory to ensure the cooling output matches the datasheet specifications before the balance is paid.

What logistics and installation support should I arrange for a 'Factory' scale order?

Given the size of cooling towers and chillers, use Incoterms like CIF or DDP if you lack experience in heavy machinery logistics. Ensure the supplier provides detailed installation drawings, foundation requirements, and wiring diagrams in English. For complex setups, negotiate for on-site commissioning support or, at minimum, real-time video installation guidance from their engineering team.

Related queries